Turn over the trowel to the notched side and comb over in one direction.
Tile shower pan or walls first.
1 4 1 4 1 4 square notched trowel.
Regardless of which you do first always run the floor under the wall tile.
Always tile the back wall first in a shower tub so that you can hide the grout joints on the sides.
Therefore the pan must be installed first.
If you prefer doing the shower floor first you can avoid accidental accidents by covering the new floor tile.
You could use a score and snap tile cutter or a wet saw with a diamond blade.
Just leave off the bottom row.
If you tile the floor first you may accidentally damage the new floor by dropping things on it.
Spread thin set along the first section of your tile row.
Tuscan seamclips blue horseshoe shims 1 16 sponge.
Carpet knife for thin set removal.
This will create a small lip at the bottom of the shower walls where tiles or an acrylic surround would bump out leaving a gap.
If your shower pan is not level then the level line you created to mark the top of the first row will mean that some of your tiles need to be cut.
Installing a shower pan includes many steps such as cementing the floor to create a sturdy base and installing the shower walls.
Shower floor or walls first.
Or difficult to remove mortar drops when tiling the wall.
Run a damp sponge over the backer board in the area you intend to tile.
This may result in cracked tile.
We re going to dive into the details.
Later patch the holes with kerdi membrane band or kerdi fix.
Then tile the floor and then last row of the walls.
Here s your supply list.
This allows you to nail up a level stick to hold the wall tiles.
Use a small amount of the excess mortar and spread it onto the back of a tile with the notched.